Yurika Lake Julius Substation Upgrade
AEP Elical were engaged by Yurika to complete a substation upgrade at the Lake Julius site. The upgrade to the substation required creating separate enclosures for the Mount Isa Water Board transformers and the Sunwater transformer. Part of this upgrade included the relocation of a Mount Isa Water Board transformer and the introduction of a three-way switch to separate the supply to the transformers. AEP Elical was responsible for the design deliverables including:
Plant;
Operating;
Metering and Protection;
Switchroom GA Layout
General Arrangement Plant;
Materials List; and
Site Layout.