Rio Tinto Aluminium Weipa Infrastructure Life Extension Study
AEP Elical undertook the electrical, controls and communications work associated with a high-level condition assessment of the electrical infrastructure. The scope encompassed power generation and distribution, motor control center (MCC), control systems and communications systems, and the preparation of an order of magnitude estimate of capital expenditure. The study aimed to extend the life of the assets in the order of 25-40 years.